Skip to content

Bathroom Remodeler Estimate Template

A bathroom remodeler estimate forecasts the price before work starts: 10 lines for gut and remodel a 5x8 ft hall bathroom with a tiled tub surround, vanity and new toilet, totalling $9,475.00, with labour the largest share (39%). It states its assumptions and stays valid for 30 days. Edit the lines and download the PDF.

Pre-filled for a bathroom remodeler: gut and remodel a 5x8 ft hall bathroom with a tiled tub surround, vanity and new toilet. Example prices: replace them with your own.

Document
From (you)
Prepared for
Line items
  1. Amount$1,400.00
  2. Amount$1,650.00
  3. Amount$420.00
  4. Amount$450.00
  5. Amount$1,840.00
  6. Amount$950.00
  7. Amount$1,250.00
  8. Amount$780.00
  9. Amount$385.00
  10. Amount$350.00
Discount, tax and payments

Estimate total: $9,475.00

Notes, payment details and extra fields
Design, logo, currency and paper
Logo (PNG or JPEG, up to 1 MB; stays on your device)

Pro tools

Saved clients, item library, auto-numbering, history and bulk PDFs is part of Pro.

From

Harbor Bathroom Remodeling

519 Market Street
Georgetown, TX 78626

billing@example.com

(512) 555-0119

Estimate

Estimate #
EST-3744
Estimate date
Oct 29, 2026
Valid until
Nov 28, 2026
Terms
Valid 30 days
Contractor license no.
LIC-775460
Job site address
140 Orchard Drive
Permit no.
BP-432619
Fixture selections
See notes

Prepared for

Taylor Brooks

140 Orchard Drive
Madison, WI 53703

client@example.com

DescriptionQtyRateAmount
Demolition to studs and debris removal1 project$1,400.00$1,400.00
Plumbing rough-in: new mixing valve and drain1 project$1,650.00$1,650.00
Alcove tub, enameled steel1 each$420.00$420.00
Cement board and waterproofing, tub surround75 sq ft$6.00$450.00
Tile installation, surround and floor115 sq ft$16.00$1,840.00
Tile and setting materials allowance1 lot$950.00$950.00
36 in vanity with top, installed1 each$1,250.00$1,250.00
Toilet, faucet and shower trim, installed1 lot$780.00$780.00
Replace exhaust fan, ducted outside1 each$385.00$385.00
Permit fees1 each$350.00$350.00
Subtotal
$9,475.00
Estimate total
$9,475.00

Notes

A bathroom remodel estimate should list fixture allowances, tile area, the waterproofing system, a unit price for rot repair and how long the room will be out of service.

Made with Billwise - invoice-pdf-maker-app.web.app

Preview of the PDF. Everything stays in your browser: nothing is uploaded.

Preview

Bathroom Remodeler estimate at a glance

Scope estimated Gut and remodel a 5x8 ft hall bathroom with a tiled tub surround, vanity and new toilet
Estimate total $9,475.00 before tax
Valid for 30 days from the estimate date
Deposit A deposit to order fixtures and tile is standard; many states cap the amount, so check your state's rules.
Labour (3 lines) $3,690.00, 39%
Services (3 lines) $2,815.00, 30%
Products (2 lines) $1,670.00, 18%
Priced in project

Estimate breakdown for gut and remodel a 5x8 ft hall bathroom with a tiled tub surround, vanity and new toilet

Example prices: replace them with your own
ItemTypeEst. quantityEst. amount
Demolition to studs and debris removalLabour1 project$1,400.00
Plumbing rough-in: new mixing valve and drainServices1 project$1,650.00
Alcove tub, enameled steelProducts1 each$420.00
Cement board and waterproofing, tub surroundLabour75 sq ft$450.00
Tile installation, surround and floorLabour115 sq ft$1,840.00
Tile and setting materials allowanceMaterials1 lot$950.00
36 in vanity with top, installedProducts1 each$1,250.00
Toilet, faucet and shower trim, installedServices1 lot$780.00
Replace exhaust fan, ducted outsideServices1 each$385.00
Permit feesFees1 each$350.00
Estimated total$9,475.00

What to write on a bathroom remodeler estimate

A bathroom remodel estimate should list fixture allowances, tile area, the waterproofing system, a unit price for rot repair and how long the room will be out of service.

Materials and products are $2,620.00 of this $9,475.00 estimate (28%), so say how long those prices hold: supplier prices can move before the job starts.

Bids a bathroom as a fixed price with fixture and tile allowances, plus unit prices for hidden rot or water damage found after demolition.

Assumptions behind each line

Write these next to the 10 lines so the customer sees what the $9,475.00 depends on.

  • Demolition to studs and debris removal: 1 project at $1,400.00 per project ($1,400.00); extra project at the same rate.
  • Plumbing rough-in: new mixing valve and drain: 1 project, $1,650.00.
  • Alcove tub, enameled steel: 1 each at $420.00 ($420.00); another grade or brand changes this line.
  • Cement board and waterproofing, tub surround: 75 sq ft at $6.00 per sq ft ($450.00); extra sq ft at the same rate.
  • Tile installation, surround and floor: 115 sq ft at $16.00 per sq ft ($1,840.00); extra sq ft at the same rate.
  • Tile and setting materials allowance: 1 lot at $950.00 ($950.00); another grade or brand changes this line.
  • 36 in vanity with top, installed: 1 each at $1,250.00 ($1,250.00); another grade or brand changes this line.
  • Toilet, faucet and shower trim, installed: 1 lot, $780.00.
  • Replace exhaust fan, ducted outside: 1 each, $385.00.
  • Permit fees: a flat $350.00.

Changes, overruns and change orders

If the customer adds work, put it on a signed change order first. Pricing the extra in project keeps it comparable with the $9,475.00 you estimated.

A 10% rise in material prices would add $262.00 to this job, which is why many bathroom remodelers limit how long an estimate stays valid.

Tips from bathroom remodeling billing

  • Give rotted subfloor and joist repairs a unit price in advance and invoice what was actually replaced, because water damage around old toilets and tubs only shows once the floor is open.
  • Name the valve type and the waterproofing method used behind the tile, since those two hidden components are what an owner or plumber will need to know in ten years.
  • Keep the plumbing inspection and any re-inspection on separate lines, so a failed inspection caused by an owner's late fixture change does not come out of your margin.
  • When it is the only bathroom in the house, note the days the toilet was out of service and any portable toilet rental you passed through.

Turning the bathroom remodeler estimate into an invoice

  1. Get it approved

    Ask Taylor Brooks to sign or reply in writing to estimate EST-3744.

  2. Record the changes

    Update quantities to what was actually used across the 10 lines.

  3. Switch the document type

    Change Estimate to Invoice in the tool; the lines and parties stay.

  4. Deduct what was paid

    Enter any deposit as amount paid so the balance due is correct.

Frequently asked questions

How do I write a bathroom remodeler estimate?

Describe the job (Gut and remodel a 5x8 ft hall bathroom with a tiled tub surround, vanity and new toilet), list each line with an estimated quantity and rate, total it ($9,475.00 in the sample), state how long it is valid and what it assumes, then send it as a PDF for approval.

Is a bathroom remodeler estimate binding?

An estimate is a forecast, not a fixed price, so the final invoice can differ when the work or materials change. Rules vary by country and state; to stay safe, get written approval before billing noticeably more than the $9,475.00 you estimated.

How long should a bathroom remodeler estimate be valid?

Thirty days is common and is what this template uses. With 28% of the price in materials, a shorter validity protects you if supplier prices rise.

Founder price

Billwise Pro opens soon

Lifetime Pro: no footer, saved clients/items, auto numbering, CSV/XLSX export, bulk generation. Reserve the founder price: 30% off $29 one-time when Pro opens. No payment is taken now. Everything on the free plan keeps working today.

We'll e-mail you once when Pro opens, with your founder price. No account, no newsletter. See the privacy policy.