Foundation Repair Estimate Template

A foundation repair company estimate forecasts the price before work starts: 8 lines for stabilize a settling rear corner with eight steel push piers and seal two basement wall cracks, totalling $15,860.00, with materials the largest share (68%). It states its assumptions and stays valid for 30 days. Edit the lines and download the PDF.

Pre-filled for a foundation repair: stabilize a settling rear corner with eight steel push piers and seal two basement wall cracks. Example prices: replace them with your own.

Document
From (you)
Prepared for
Line items
  1. Amount$600.00
  2. Amount$1,760.00
  3. Amount$10,800.00
  4. Amount$900.00
  5. Amount$600.00
  6. Amount$770.00
  7. Amount$180.00
  8. Amount$250.00
Discount, tax and payments

Estimate total: $15,860.00

Notes, payment details and extra fields
Design, logo, currency and paper
Logo (PNG or JPEG, up to 1 MB; stays on your device)

Pro tools

Saved clients, item library, auto-numbering, history and bulk PDFs is part of Pro.

From

Oak Lane Foundation Repair

222 Market Street
Springfield, IL 62704

billing@example.com

(608) 555-0122

Estimate

Estimate #
EST-4037
Estimate date
Oct 29, 2026
Valid until
Nov 28, 2026
Terms
Valid 30 days
Engineer report no.
See notes
Permit no.
BP-606514
Pier plan reference
PO-8528
Warranty no.
12 months on workmanship

Prepared for

Alex Morgan

63 Linden Place
Fairview, OR 97024

client@example.com

DescriptionQtyRateAmount
Structural engineer evaluation and report1 each$600.00$600.00
Hand excavation at pier locationsDig to footing, set aside soil and sod8 each$220.00$1,760.00
Steel push pier, installed to load-bearing strataDriven depth and final pressure recorded per pier8 pier$1,350.00$10,800.00
Hydraulic lift and transfer of loadLift attempted toward original elevation1 each$900.00$900.00
Backfill, compact and restore sod8 each$75.00$600.00
Epoxy injection of wall cracks14 linear ft$55.00$770.00
Building permit1 each$180.00$180.00
Elevation survey before and after2 each$125.00$250.00
Subtotal
$15,860.00
Estimate total
$15,860.00

Notes

A foundation repair estimate should reference the inspection or engineer's findings, give the number and type of piers with a price each, and say what happens if piers must go deeper than assumed.

Made with Billwise - invoice-pdf-maker-app.web.app

Preview of the PDF. Everything stays in your browser: nothing is uploaded.

Preview

Foundation Repair estimate at a glance

Scope estimated Stabilize a settling rear corner with eight steel push piers and seal two basement wall cracks
Estimate total $15,860.00 before tax
Valid for 30 days from the estimate date
Deposit Foundation contracts commonly take a deposit before the engineer's plan is permitted and the piers are ordered.
Materials (1 line) $10,800.00, 68%
Labour (4 lines) $4,030.00, 25%
Services (2 lines) $850.00, 5%
Priced in pier

Estimate breakdown for stabilize a settling rear corner with eight steel push piers and seal two basement wall cracks

Example prices: replace them with your own
ItemTypeEst. quantityEst. amount
Structural engineer evaluation and reportServices1 each$600.00
Hand excavation at pier locationsLabour8 each$1,760.00
Steel push pier, installed to load-bearing strataMaterials8 pier$10,800.00
Hydraulic lift and transfer of loadLabour1 each$900.00
Backfill, compact and restore sodLabour8 each$600.00
Epoxy injection of wall cracksLabour14 linear ft$770.00
Building permitFees1 each$180.00
Elevation survey before and afterServices2 each$250.00
Estimated total$15,860.00

What to write on a foundation repair estimate

A foundation repair estimate should reference the inspection or engineer's findings, give the number and type of piers with a price each, and say what happens if piers must go deeper than assumed.

Materials and products are $10,800.00 of this $15,860.00 estimate (68%), so say how long those prices hold: supplier prices can move before the job starts.

Foundation stabilization is priced per pier installed, with an engineer's evaluation, excavation access and lifting attempts listed as separate items.

Assumptions behind each line

Write these next to the 8 lines so the customer sees what the $15,860.00 depends on.

  • Structural engineer evaluation and report: 1 each, $600.00.
  • Hand excavation at pier locations: 8 each at $220.00 per each ($1,760.00); extra each at the same rate.
  • Steel push pier, installed to load-bearing strata: 8 pier at $1,350.00 ($10,800.00); another grade or brand changes this line.
  • Hydraulic lift and transfer of load: 1 each at $900.00 per each ($900.00); extra each at the same rate.
  • Backfill, compact and restore sod: 8 each at $75.00 per each ($600.00); extra each at the same rate.
  • Epoxy injection of wall cracks: 14 linear ft at $55.00 per linear ft ($770.00); extra linear ft at the same rate.
  • Building permit: a flat $180.00.
  • Elevation survey before and after: 2 each, $250.00.

Changes, overruns and change orders

If the customer adds work, put it on a signed change order first. Pricing the extra in pier keeps it comparable with the $15,860.00 you estimated.

A 10% rise in material prices would add $1,080.00 to this job, which is why many foundation repair companies limit how long an estimate stays valid.

Tips from foundation repair work billing

  • Number each pier to match the pier plan and list its driven depth and final installation pressure, because that log is what an engineer, a buyer's inspector or a warranty claim will ask to see.
  • Show the elevation readings taken before and after the lift, so the customer can see how much the corner rose instead of judging the result by whether old drywall cracks closed.
  • State whether your warranty transfers to the next owner and attach its number to the invoice, since homeowners usually look for it when they sell the house.
  • Bill extra piers found necessary after excavation only with a signed change order that references the engineer's revised plan, rather than adding them to the original pier count.

Turning the foundation repair estimate into an invoice

  1. Get it approved

    Ask Alex Morgan to sign or reply in writing to estimate EST-4037.

  2. Record the changes

    Update quantities to what was actually used across the 8 lines.

  3. Switch the document type

    Change Estimate to Invoice in the tool; the lines and parties stay.

  4. Deduct what was paid

    Enter any deposit as amount paid so the balance due is correct.

Frequently asked questions

How do I write a foundation repair estimate?

Describe the job (Stabilize a settling rear corner with eight steel push piers and seal two basement wall cracks), list each line with an estimated quantity and rate, total it ($15,860.00 in the sample), state how long it is valid and what it assumes, then send it as a PDF for approval.

Is a foundation repair estimate binding?

An estimate is a forecast, not a fixed price, so the final invoice can differ when the work or materials change. Rules vary by country and state; to stay safe, get written approval before billing noticeably more than the $15,860.00 you estimated.

How long should a foundation repair estimate be valid?

Thirty days is common and is what this template uses. With 68% of the price in materials, a shorter validity protects you if supplier prices rise.

Founder price

Billwise Pro opens soon

Lifetime Pro: no footer, saved clients/items, auto numbering, CSV/XLSX export, bulk generation. Reserve the founder price: 30% off $29 one-time when Pro opens. No payment is taken now. Everything on the free plan keeps working today.

We'll e-mail you once when Pro opens, with your founder price. No account, no newsletter. See the privacy policy.