Skip to content

Foundation Repair Invoice Template

A foundation repair company invoice bills pier, lists materials, labour and services on separate lines and states the terms (Deposit at contract, balance due on completion of the lift). This template is pre-filled for stabilize a settling rear corner with eight steel push piers and seal two basement wall cracks: 8 lines totalling $15,860.00 before tax. Edit it and download the PDF.

Pre-filled for a foundation repair: stabilize a settling rear corner with eight steel push piers and seal two basement wall cracks. Example prices: replace them with your own.

Document
From (you)
Bill to
Line items
  1. Amount$600.00
  2. Amount$1,760.00
  3. Amount$10,800.00
  4. Amount$900.00
  5. Amount$600.00
  6. Amount$770.00
  7. Amount$180.00
  8. Amount$250.00
Discount, tax and payments

Balance due: $15,860.00

Notes, payment details and extra fields
Design, logo, currency and paper
Logo (PNG or JPEG, up to 1 MB; stays on your device)

Pro tools

Saved clients, item library, auto-numbering, history and bulk PDFs is part of Pro.

From

Oak Lane Foundation Repair

222 Market Street
Springfield, IL 62704

billing@example.com

(608) 555-0122

Invoice

Invoice #
INV-8628
Invoice date
Oct 29, 2026
Due date
Nov 28, 2026
Terms
Deposit at contract, balance due on completion of the lift
Engineer report no.
See notes
Permit no.
BP-606514
Pier plan reference
PO-8528
Warranty no.
12 months on workmanship

Bill to

Alex Morgan

63 Linden Place
Fairview, OR 97024

client@example.com

DescriptionQtyRateAmount
Structural engineer evaluation and report1 each$600.00$600.00
Hand excavation at pier locationsDig to footing, set aside soil and sod8 each$220.00$1,760.00
Steel push pier, installed to load-bearing strataDriven depth and final pressure recorded per pier8 pier$1,350.00$10,800.00
Hydraulic lift and transfer of loadLift attempted toward original elevation1 each$900.00$900.00
Backfill, compact and restore sod8 each$75.00$600.00
Epoxy injection of wall cracks14 linear ft$55.00$770.00
Building permit1 each$180.00$180.00
Elevation survey before and after2 each$125.00$250.00
Subtotal
$15,860.00
Balance due
$15,860.00

Notes

Thank you for choosing Oak Lane Foundation Repair. Terms: Deposit at contract, balance due on completion of the lift.

Payment details

Bank transfer or card. Please quote the invoice number.

Made with Billwise - invoice-pdf-maker-app.web.app

Preview of the PDF. Everything stays in your browser: nothing is uploaded.

Preview

Foundation Repair invoice at a glance

Typical job Stabilize a settling rear corner with eight steel push piers and seal two basement wall cracks
Main billing unit pier
Usual payment terms Deposit at contract, balance due on completion of the lift
Deposit practice Foundation contracts commonly take a deposit before the engineer's plan is permitted and the piers are ordered.
Sample lines 8 lines, $15,860.00 before tax
Largest line Steel push pier, installed to load-bearing strata: $10,800.00 (68%)
Trade-specific fields Engineer report no., Permit no., Pier plan reference, Warranty no., Property address

Sample foundation repair invoice line items

Stabilize a settling rear corner with eight steel push piers and seal two basement wall cracks: 8 lines adding up to $15,860.00, split into materials $10,800.00 (68%), labour $4,030.00 (25%) and services $850.00 (5%).

Example prices: replace them with your own
ItemQtyRateAmount
Structural engineer evaluation and report1 each$600.00$600.00
Hand excavation at pier locations (Dig to footing, set aside soil and sod)8 each$220.00$1,760.00
Steel push pier, installed to load-bearing strata (Driven depth and final pressure recorded per pier)8 pier$1,350.00$10,800.00
Hydraulic lift and transfer of load (Lift attempted toward original elevation)1 each$900.00$900.00
Backfill, compact and restore sod8 each$75.00$600.00
Epoxy injection of wall cracks14 linear ft$55.00$770.00
Building permit1 each$180.00$180.00
Elevation survey before and after2 each$125.00$250.00
Subtotal$15,860.00
Total before tax$15,860.00

What a foundation repair invoice should include

  • Your foundation repair company name, address, phone and email, plus a tax ID if you are registered
  • The customer's name and billing address (Alex Morgan in the sample)
  • A unique invoice number (INV-8628) and the issue date
  • Payment terms and a due date: Deposit at contract, balance due on completion of the lift
  • Engineer report no.: for example See notes
  • Permit no.: for example BP-606514
  • Pier plan reference: for example PO-8528
  • Warranty no.: for example 12 months on workmanship
  • Line items in pier or per item, each with quantity, rate and amount
  • How to pay you: bank details, card link or cheque payee

How foundation repair companies bill

Foundation stabilization is priced per pier installed, with an engineer's evaluation, excavation access and lifting attempts listed as separate items.

Foundation repair companies commonly use "Deposit at contract, balance due on completion of the lift", so the invoice is payable the day it is issued. Foundation contracts commonly take a deposit before the engineer's plan is permitted and the piers are ordered.

U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2024: median hourly wage of Cement Masons and Concrete Finishers $26.28 (employees, not contractor rates).

Foundation Repair invoicing tips

  • Number each pier to match the pier plan and list its driven depth and final installation pressure, because that log is what an engineer, a buyer's inspector or a warranty claim will ask to see.
  • Show the elevation readings taken before and after the lift, so the customer can see how much the corner rose instead of judging the result by whether old drywall cracks closed.
  • State whether your warranty transfers to the next owner and attach its number to the invoice, since homeowners usually look for it when they sell the house.
  • Bill extra piers found necessary after excavation only with a signed change order that references the engineer's revised plan, rather than adding them to the original pier count.

Foundation Repair billing disputes to head off

  • Customers often expect the house to return to perfectly level. Writing on the estimate and invoice that lift is attempted, not guaranteed, and that the piers are priced for stabilization prevents the most common complaint.
  • Lifting a structure can crack drywall, stick doors or stress plumbing lines; listing those as possible side effects outside the price keeps follow-up repairs from becoming a free-work demand.

Work a foundation repair can bill for

Core tasks of Cement Masons and Concrete Finishers (O*NET 47-2051.00, O*NET 29.x task statements, CC BY 4.0). Each can become a line on the invoice.

  • Check the forms that hold the concrete to see that they are properly constructed.
  • Set the forms that hold concrete to the desired pitch and depth, and align them.
  • Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
  • Mold expansion joints and edges, using edging tools, jointers, and straightedge.
  • Monitor how the wind, heat, or cold affect the curing of the concrete throughout the entire process.
  • Signal truck driver to position truck to facilitate pouring concrete, and move chute to direct concrete on forms.

How to make a foundation repair invoice

  1. Add both parties

    Enter Oak Lane Foundation Repair (your business) and the customer, Alex Morgan, then engineer report no..

  2. Number and terms

    Give it a unique number such as INV-8628 and set the terms to Deposit at contract, balance due on completion of the lift.

  3. List the work

    One line per item: the sample runs from "Structural engineer evaluation and report" (1 each) to "Elevation survey before and after" (2 each).

  4. Check the total

    The 8 lines come to $15,860.00; add sales tax only if your state taxes foundation repair work.

  5. Download and send

    Download the PDF or print it, then keep a copy with the foundation repair work records.

Frequently asked questions

How do I make a foundation repair invoice?

Add your foundation repair company details, the customer, engineer report no., permit no., pier plan reference and warranty no., then one line per item with quantity and rate. The template above is pre-filled with 8 lines for stabilize a settling rear corner with eight steel push piers and seal two basement wall cracks totalling $15,860.00; change the prices and download the PDF.

How do foundation repair companies charge?

Mostly pier. Foundation stabilization is priced per pier installed, with an engineer's evaluation, excavation access and lifting attempts listed as separate items.

When should a foundation repair invoice be paid?

Deposit at contract, balance due on completion of the lift is the usual arrangement. Foundation contracts commonly take a deposit before the engineer's plan is permitted and the piers are ordered. Put the terms and the due date on the invoice so there is no doubt.

How much do foundation repair companies earn per hour?

U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2024: median hourly wage of Cement Masons and Concrete Finishers $26.28 (employees, not contractor rates). Self-employed rates are usually higher because they cover overhead and unbilled time.

Founder price

Billwise Pro opens soon

Lifetime Pro: no footer, saved clients/items, auto numbering, CSV/XLSX export, bulk generation. Reserve the founder price: 30% off $29 one-time when Pro opens. No payment is taken now. Everything on the free plan keeps working today.

We'll e-mail you once when Pro opens, with your founder price. No account, no newsletter. See the privacy policy.