Skip to content

Landscaping Estimate Template

A landscaping business estimate forecasts the price before work starts: 9 lines for install a 300 sq ft planting bed with shrubs, perennials, mulch and drip irrigation, plus a 3 x 12 ft paver walkway, totalling $3,973.00, with services the largest share (38%). It states its assumptions and stays valid for 30 days. Edit the lines and download the PDF.

Pre-filled for a landscaping: install a 300 sq ft planting bed with shrubs, perennials, mulch and drip irrigation, plus a 3 x 12 ft paver walkway. Example prices: replace them with your own.

Document
From (you)
Prepared for
Line items
  1. Amount$675.00
  2. Amount$504.00
  3. Amount$280.00
  4. Amount$225.00
  5. Amount$650.00
  6. Amount$864.00
  7. Amount$360.00
  8. Amount$325.00
  9. Amount$90.00
Discount, tax and payments

Estimate total: $3,973.00

Notes, payment details and extra fields
Design, logo, currency and paper
Logo (PNG or JPEG, up to 1 MB; stays on your device)

Pro tools

Saved clients, item library, auto-numbering, history and bulk PDFs is part of Pro.

From

Cedar Hill Landscaping

281 Market Street
Georgetown, TX 78626

billing@example.com

(503) 555-0181

Estimate

Estimate #
EST-7774
Estimate date
Oct 29, 2026
Valid until
Nov 28, 2026
Terms
Valid 30 days
Project address
52 Aspen Way
Design / plan reference
PO-8496
811 locate ticket no.
Max (Beagle)
Plant warranty period
23 November 2026

Prepared for

Riley Chen

52 Aspen Way
Springfield, IL 62704

client@example.com

DescriptionQtyRateAmount
Bed preparation: sod removal and soil amendmentStrip turf, till in compost300 sq ft$2.25$675.00
Shrubs, 3-gallon (boxwood and hydrangea)12 each$42.00$504.00
Perennials, 1-gallon20 each$14.00$280.00
Hardwood mulch, delivered and spread 3 in deep3 cu yd$75.00$225.00
Drip irrigation zone with timerTied into an existing valve, emitter at each plant1 project$650.00$650.00
Paver walkway, 3 x 12 ftExcavate 7 in, compacted base, sand-set, polymeric sand joints36 sq ft$24.00$864.00
Steel bed edging60 linear ft$6.00$360.00
Compact track loader rental1 day$325.00$325.00
Sod and debris disposal1 load$90.00$90.00
Subtotal
$3,973.00
Estimate total
$3,973.00

Notes

A landscaping estimate should list plants by species and container size, materials by cubic yard or square foot, the irrigation and hardscape scope and the plant warranty terms.

Made with Billwise - invoice-pdf-maker-app.web.app

Preview of the PDF. Everything stays in your browser: nothing is uploaded.

Preview

Landscaping estimate at a glance

Scope estimated Install a 300 sq ft planting bed with shrubs, perennials, mulch and drip irrigation, plus a 3 x 12 ft paver walkway
Estimate total $3,973.00 before tax
Valid for 30 days from the estimate date
Deposit Landscape installers commonly take a deposit, often a third to half of the price, before ordering plants and hardscape materials.
Services (2 lines) $1,514.00, 38%
Products (2 lines) $784.00, 20%
Labour (1 line) $675.00, 17%
Priced in project

Estimate breakdown for install a 300 sq ft planting bed with shrubs, perennials, mulch and drip irrigation, plus a 3 x 12 ft paver walkway

Example prices: replace them with your own
ItemTypeEst. quantityEst. amount
Bed preparation: sod removal and soil amendmentLabour300 sq ft$675.00
Shrubs, 3-gallon (boxwood and hydrangea)Products12 each$504.00
Perennials, 1-gallonProducts20 each$280.00
Hardwood mulch, delivered and spread 3 in deepMaterials3 cu yd$225.00
Drip irrigation zone with timerServices1 project$650.00
Paver walkway, 3 x 12 ftServices36 sq ft$864.00
Steel bed edgingMaterials60 linear ft$360.00
Compact track loader rentalEquipment1 day$325.00
Sod and debris disposalFees1 load$90.00
Estimated total$3,973.00

What to write on a landscaping estimate

A landscaping estimate should list plants by species and container size, materials by cubic yard or square foot, the irrigation and hardscape scope and the plant warranty terms.

Materials and products are $1,369.00 of this $3,973.00 estimate (34%), so say how long those prices hold: supplier prices can move before the job starts.

Installs are estimated per project from material quantities (yards of mulch, plants, pavers) plus crew hours and equipment, usually with a deposit before materials are ordered.

Assumptions behind each line

Write these next to the 9 lines so the customer sees what the $3,973.00 depends on.

  • Bed preparation: sod removal and soil amendment: 300 sq ft at $2.25 per sq ft ($675.00); extra sq ft at the same rate.
  • Shrubs, 3-gallon (boxwood and hydrangea): 12 each at $42.00 ($504.00); another grade or brand changes this line.
  • Perennials, 1-gallon: 20 each at $14.00 ($280.00); another grade or brand changes this line.
  • Hardwood mulch, delivered and spread 3 in deep: 3 cu yd at $75.00 ($225.00); another grade or brand changes this line.
  • Drip irrigation zone with timer: 1 project, $650.00.
  • Paver walkway, 3 x 12 ft: 36 sq ft, $864.00.
  • Steel bed edging: 60 linear ft at $6.00 ($360.00); another grade or brand changes this line.
  • Compact track loader rental: 1 day of hire ($325.00); longer hire is extra.
  • Sod and debris disposal: a flat $90.00.

Changes, overruns and change orders

If the customer adds work, put it on a signed change order first. Pricing the extra in project keeps it comparable with the $3,973.00 you estimated.

A 10% rise in material prices would add $136.90 to this job, which is why many landscaping businesses limit how long an estimate stays valid.

Tips from landscaping billing

  • List plants by species, container size and count, because a 3-gallon and a 7-gallon boxwood look identical on an invoice that just says 'shrubs' and differ a lot in price.
  • Put the plant warranty in writing, for example one year if watered as instructed, and say whether it covers a replacement plant only or the labor to replant as well.
  • Show mulch, soil and gravel in cubic yards and paver work by the square foot, so the customer can measure the beds and check the quantities themselves.
  • Note the 811 utility locate ticket number on any job that involves digging; it documents that buried lines were called in and marked before excavation began.

Turning the landscaping estimate into an invoice

  1. Get it approved

    Ask Riley Chen to sign or reply in writing to estimate EST-7774.

  2. Record the changes

    Update quantities to what was actually used across the 9 lines.

  3. Switch the document type

    Change Estimate to Invoice in the tool; the lines and parties stay.

  4. Deduct what was paid

    Enter any deposit as amount paid so the balance due is correct.

Frequently asked questions

How do I write a landscaping estimate?

Describe the job (Install a 300 sq ft planting bed with shrubs, perennials, mulch and drip irrigation, plus a 3 x 12 ft paver walkway), list each line with an estimated quantity and rate, total it ($3,973.00 in the sample), state how long it is valid and what it assumes, then send it as a PDF for approval.

Is a landscaping estimate binding?

An estimate is a forecast, not a fixed price, so the final invoice can differ when the work or materials change. Rules vary by country and state; to stay safe, get written approval before billing noticeably more than the $3,973.00 you estimated.

How long should a landscaping estimate be valid?

Thirty days is common and is what this template uses. With 34% of the price in materials, a shorter validity protects you if supplier prices rise.

Founder price

Billwise Pro opens soon

Lifetime Pro: no footer, saved clients/items, auto numbering, CSV/XLSX export, bulk generation. Reserve the founder price: 30% off $29 one-time when Pro opens. No payment is taken now. Everything on the free plan keeps working today.

We'll e-mail you once when Pro opens, with your founder price. No account, no newsletter. See the privacy policy.